TBC-BRINADD Fluid Systems
    Brigdesal-Ultra Pill



Design & Application

  Salt Systems
  Oil Soluble Resins

Products Info
  Bridgesal -Ultra
  Thixsal-Ultra
  Hysal
  PBS Plug
  Safety Data

Application & Mixture
  Sealing & Curing losses
  Seal Application
  Drill & Remove fill
  Change of ESP
 Salt Systems
  up to 250°F
  up to 265°F
  up to 275°F
  up to 290°F
  up to 305°F
  Curing losses after Frac Job
  Mill / Fish
 Oil Soluble
  OSS Pill
  OSS Pill & Solubridge

 
The following will be used in these cases :
(a) After a shoot & pull job and prior to p.o.o.h.
(b) To control & cure losses before a workover,
before pulling completion string in case string is not parted or has holes in it,
or when pulling an E.S.P. pump out of hole

Mixing Procedure for Temperature up to 250°F

Thixsal-Ultra Viscous Carrier Fluid Preparation

Allow Pill to agitate for 10-15 mns prior to pumping downhole.

The Pill will be displaced downhole using Thixsal-Ultra minimum 5bbls ahead and 10 bbls behind.
The Bridgesal-Ultra temp limitation is 335°F Using the correct formula.

Pill volume normally needed is:
½ to 1 barrel per foot of open perfs + volume to fill inside the casing from plug back total depth up to +/- 100 to above top open perforation .

Note: The needed Thixsal-Ultra as viscous fluid carrier ahead & behind should be mixed using a concentration of 6 ppb in water .