The
Y-block used when selective testing
or production is needed in the presence of two producing
zones . The
Y-block is run on the long
string side below the packer and no flow back is possible
thru it.
Underbalance perforation is achieved thru artificial lift
on the short string in association with the usage of our
Pyro-electrical Time
Delay preset at the desired timing between 7 minutes
and 8 hours.
It is an economical way of perforating two zones far apart
separetly in one trip.